![]() ![]() All work shall be done in accordance with the current STANDARDS for Soil Erosion and Sediment Control in NJ. All Soil Erosion and Sediment Control practices shall be installed prior to any major soil disturbances, or in their proper sequence as outlined within the Sequence of Construction on the Certified Soil Erosion and Sediment Control Plan, and maintained until permanent protection is established.ħ. A copy of the certified Soil Erosion and Sediment Control plan shall be maintained on site at all times.Ħ. The revised plans must meet all current State Soil Erosion & Sediment Control STANDARDS.ĥ. Any changes to the Certified Soil Erosion and Sediment Control Plan, including an increase in the limit of disturbance, will require the submission of revised Soil Erosion and Sediment Control Plans to the District for recertification. ![]() The Mercer County Soil Conservation District shall be notified of any changes in ownership.Ĥ. The online application process will require entry of an SCD certification code, which is provided by the Soil Conservation District upon certification of the Soil Erosion and Sediment Control Plan.ģ. This permit must be filed prior to the start of soil disturbance. Phone: 60 Fax: 60 Email: If applicable to this project, the owner should be aware of his or her obligation to file for a NJPDES Construction Activity Stormwater 5G3 Permit (NJG0088323) via the NJDEP online permitting system (and to maintain the associated best management practices and Stormwater Pollution Prevention Plan self-inspection logbook onsite at all times. MCSCD, 590 Hughes Drive, Hamilton Square, NJ 08690 Notice may be mailed, faxed or emailed to: The Mercer County Soil Conservation District shall be notified 48 hours prior to starting land disturbance activity. (for inclusion on all SESC plans submitted for review and certification)ġ. Existing references have been updated and consolidated into one document.REQUIRED SOIL EROSION AND SEDIMENT CONTROL NOTES ![]() Most importantly, it should be the basis for plan preparation and submittal by engineering consultants. This manual is intended to be a reference guide for engineers, developers, reviewers, and inspectors it will also be used by our plan reviewers to ensure consistency in the plan review process. ![]() This process includes the submission and review of these plans for each of the following three phases of plan development: The Maryland Stormwater Management Act of 2007, and the 2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control, requires a comprehensive review process for approval of all erosion, sediment, and stormwater management plans. Acceptable erosion and sediment control plans must be designed to mitigate soil erosion, prevent increase in stormwater runoff, and minimize the discharge of pollutants. To improve the enforcement of approved grading, erosion and sediment control and Stormwater Management (SWM) Pond Plans, the District staff provides technical training to the County’s Department of Public Works and Transportation Office of Engineering and to the Department of Permits, Inspections and Enforcement site inspectors.ĭependence on the natural resources of Maryland is unending-and so is the need to protect our environment. The District is regarded as being responsive to the needs of the development community and in the private engineering sector for reviewing and approving grading, erosion and sediment control plans in a timely manner. While maximum turnaround time set by the Board of Supervisors is ten business days, the average turnaround time for plans submitted is under five business days. Grading, erosion and sediment control plans are reviewed and approved for residential, commercial, forest harvest, stream maintenance, surface mining, fill sites, landfills and county or municipal projects.ĭistrict Urban staff review an average of 1800 plan submissions per year. Please review our current policy regarding plan submissions and drop-offs on our COVID-19 Updates & Resources page.Įrosion and sediment control plans are reviewed for conformance with the Maryland Standards and Specifications for Soil Erosion and Sediment Control, as well as, the Prince George’s Soil Conservation District Soil Erosion and Sediment Control Pond Safety Reference Manual.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |